Guide

Office move checklist: the order things actually have to happen

Updated

Most office moves that go badly went badly weeks before move day, because something with a long lead time was started late.

Six months out

  • Confirm both lease dates, including any overlap you can negotiate. Overlap is the cheapest insurance in a move.
  • Ask the outgoing landlord for the schedule of dilapidations position early. It has its own timetable and its own advisers, and finding out late is what turns a budget over.
  • Start connectivity for the new building. Circuits are ordered, not switched.
  • Get the new building surveyed for access: goods lift dimensions and booking rules, loading bay, permitted working hours.

Three months out

  • Get removal quotes against a survey of both buildings, with the working hours assumption written in.
  • Decide the IT sequence and who owns decommission, transport and recommission.
  • Decide what is coming with you and what is being cleared, and get clearance and disposal quoted with it.
  • Book crate delivery and collection dates, and check the hire clock terms.

One month out

  • Confirm lift bookings, parking suspensions and any access permits at both ends.
  • Circulate the labelling scheme and the packing rules to staff. A move fails on labelling more often than on lifting.
  • Confirm insurance limits, including single-item limits for anything valuable.
  • Confirm the waste carrier registrations and how you get the transfer notes back.

Move week

  1. Walk both buildings with the move manager and agree the sequence in person, not by email.
  2. Agree the rollback plan and the time by which the decision gets made.
  3. Keep one person on site at each end for the whole window with authority to make decisions.
  4. Do the snag walk of the old building before handing back keys, and photograph the condition.

Two lead times block everything else: connectivity into the new building, and the dilapidations position at the old one. Start both first.

Questions, answered directly

How far in advance should you plan an office move?

Six months is a comfortable runway for anything over about 25 desks, mainly because connectivity into a new building and the dilapidations position at the old one both have long lead times. Smaller moves can run on eight to twelve weeks if the buildings are straightforward.

What is the most commonly missed item in an office move budget?

Dilapidations at the outgoing building. It is a separate obligation to your landlord, priced by building surveyors rather than removers, and it routinely costs more than the removal itself.